15-01: Numerical Study on Erosion at the Tube Entry Region of an Air Cooled Repair and Construction

Regular price $ 20.00
Tax included. Shipping calculated at checkout.
Description

15-01: Numerical Study on Erosion at the Tube Entry Region of an Air Cooled Repair and ConstructionA parametric study has been carried out to investigate the effect of steam velocity, particle diameter, particle amount, particle material, and steam velocity profile on heat exchanger tube erosion using CFD. The discrete phase model is used to analyze erosion behavior and each simulation condition is evaluated in terms of erosion rate. Several erosion mitigation methods are described based on CFD results.

Matrai Power Plant in Hungary decided in 1990 to replace all former "solutions" with one "Quality Set" for the different performances

Kentucky Power Company's Big Sandy Unit 1 cooling tower was the first built in this country using large-scale natural draft design with a concrete hyperbolic shell

Money is just as surely a corrosion engineer's tool as is a test coupon or a pH meter

The use of larger and more efficient mechanically induced draft cooling tower fans has given rise to the use of long single piece fan gearbox input shafts

water conservation)

It will take into account the evolution of regulation in Europe

The consumptive use of water is of con­cern to us -- for plants that use cooling towers (the practical alternate method to using stream or reservoir water) use more (consumptive) water per kilowatt hour generated than do plants which are able to circulate their cooling water in lakes

This paper will evaluate the standard and published data for small towers per ATC-128 with respect to usability for acoustical consultants

While owners of cooling towers are concerned about managing their legal liability

Cooling tower assessments / inspections are recognized as a practical and necessary aspect of regular monitoring of the structure’s condition

provide additional information not supplied by the Isokinetic test procedure

With careful design

Easy Shipping

Quick Dispatch:

Your 15-01: Numerical Study on Erosion at the Tube Entry Region of an Air Cooled Repair and Construction orders ship within 1-2 business days.

Delivery Options:

  • Standard: 3-7 business days
  • Fast: 2-3 business days
  • Express: 1-2 business days

Order Tracking:

You'll receive a tracking link by email once your 15-01: Numerical Study on Erosion at the Tube Entry Region of an Air Cooled Repair and Construction ships.

Need Help?
Questions about 15-01: Numerical Study on Erosion at the Tube Entry Region of an Air Cooled Repair and Construction, sizing, or delivery? We're just an email away.

Live Shipping Estimates:
Enter your location at checkout to see available shipping methods and costs for 15-01: Numerical Study on Erosion at the Tube Entry Region of an Air Cooled Repair and Construction in your area.

Get Shipping Estimates

You may also like

recommand products

{{{showcase_5_name}}}

US$ {{{showcase_5_price}}}

Min. order: 1 piece

{{{showcase_5_star}}} ({{{showcase_5_reviews}}} reviews)

Sold : Login>>

{{{showcase_6_name}}}

US$ {{{showcase_6_price}}}

Min. order: 1 piece

{{{showcase_6_star}}} ({{{showcase_6_reviews}}} reviews)

Sold : Login>>

{{{showcase_7_name}}}

US$ {{{showcase_7_price}}}

Min. order: 1 piece

{{{showcase_7_star}}} ({{{showcase_7_reviews}}} reviews)

Sold : Login>>

{{{showcase_8_name}}}

US$ {{{showcase_8_price}}}

Min. order: 1 piece

{{{showcase_8_star}}} ({{{showcase_8_reviews}}} reviews)

Sold : Login>>

{{{showcase_9_name}}}

US$ {{{showcase_9_price}}}

Min. order: 1 piece

{{{showcase_9_star}}} ({{{showcase_9_reviews}}} reviews)

Sold : Login>>

{{{showcase_10_name}}}

US$ {{{showcase_10_price}}}

Min. order: 1 piece

{{{showcase_10_star}}} ({{{showcase_10_reviews}}} reviews)

Sold : Login>>